Single-phase vs. Three-phase Supply
Generally, you should change to a 3-phase supply if you have three (3) or more air-conditioners in your home. Upgrading to a 3-phase supply will increase stability and reliability of electricity supply to your premises.
A single-phase meter measures usage from a 230 volt supply through two (2) wires, while a 3-phase meter measures usage from a 415 volt supply through four (4) wires.
Fill Up Termination Form
- Customer fills the electricity application form
- a) Click here to Download Residential (Domestic) Application Form.
- b) Click here to Download Commercial & Industrial (Non-Domestic) Application Form.
- Attach together the required documents.
- a) Example:
- - Photocopy of NRIC
- - Registered Sales & Purchase Agreement / Land Title / Tenancy Agreement / Offer Letter Memorandum of Transfer (wherever applicable)
- - Consent Letter from Partner (if any)
- - Business Registration Document (if registered under a company name)
- - Company stamp (if registered under a company name)
- Applicants must complete all the personal details and information before submitting the application form together with supporting documents as required by SESB.
Appoint Registered SESB Contractor
- Appoint Electrical Wiring Contractor.Click here
- The appointed Electrical Wiring Contractor shall fill up Form G and H.
- The appointed Electrical Wiring Contractor shall submit the electricity application form together with the required documents to SESB
Pay Connection Charges
- SESB will calculate the connection charges for the electricity connection to the premis.
- Customer pays the connection charges and RM10 stamp duty.
Pay Deposit
- Customer pays the electricity deposit
- SESB installs meter and connects supply